Graham Construction and Substance Architecture joined Wells Fargo to create a one-of-a-kind Museum experience. This project remodeled an existing bank
-
date: 02 Nov 2018
-
client: LightEdge Tenant Improvements
-
location: Des Moines, IA
LightEdge Tenant Improvements
Looking at projects from an owner’s or client’s point of view is a core part of the Graham Mentality and Graham Construction. When we partnered with LightEdge for their tenant outfit, we worked on an aggressive three-and-a-half-month schedule to meet their needs. In equipping the 17,825 square-foot space for their needs, all the mechanical, electrical, and plumbing elements were designed and built by Graham Construction. The building itself also utilizes a walker duct system, in which the electrical and wiring are under the floor to maximize flexibility for design when working within spaces.
Graham Construction originally built the 909 Locust Street location and was well acquainted with the layout and overall design flow of the building, allowing LightEdge’s space on the third floor to tie in seamlessly with the rest of the building.